UTC TruVision IP Dome Guía de instalación Pagina 20

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 28
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 19
20 Installation Guide
Note: If required, you can route cables through the side
opening of the mounting base.
4. Loosen the tilt lock screws, and adjust the tilting position
in a range of 65 degrees. Retighten the tilt lock screws.
Rotate the dome liner to adjust the panning position in a
range of 360 degrees to obtain the desired surveillance
angle.
Adjust
screw
Vista de pagina 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Comentarios a estos manuales

Sin comentarios